Dust Collectors at Mosaic Big Bend

The Big Bend HARP Terminal is a facility that receives, warehouses, and ships finished fertilizer products.  CCI was selected to Design and Build dust collection systems to control emissions from a rotary rail car dump station and two conveyor belt transfer points.  Designed by Al Andreansky, PE, these systems included […]

Read more

Cedar Key Marina Gulf Side Boat Ramp

This Boat Ramp Facility renovation included the installation of a new 96 ft. long concrete boat ramp, floating dock, fixed dock, and parking lot and amenity improvements.  Cedar Key is an island community located on the Gulf of Mexico.  Due to the project’s location in state waters, construction activities were […]

Read more

Vulcan Materials Florida Rock Division Labelle Plant

Vulcan Materials, an industry leader in construction materials production,  selected CCI as Construction Manager on a new Ready Mix Cement Plant for their Florida Rock Division in Labelle, Florida. This turnkey project involved transforming a 7 acre wooded site into a fully operational Ready Mix Batch Plant, complete with underground […]

Read more

Vulcan Materials Florida Rock Division Daytona Beach Plant

Vulcan Materials, an industry leader in construction materials production,  once again selected CCI as Construction Manager on a new Ready Mix Cement Plant for their Florida Rock Division in Daytona Beach, Florida. This turnkey project, almost identical to the recently completed Labelle plant, involved transforming a 7 acre wooded site […]

Read more

Morningside Nature Center Center Cypress Dome Boardwalk

This park improvement project included the construction of 367 LF of elevated boardwalk through the beautiful cypress domes at Morningside Nature Park in Gainesville, FL. The boardwalk is constructed to be ADA accessible and includes protective screening and handrails.  Site work was required to clear the path of construction, but […]

Read more

University of Florida Center for Movement Disorders and Neurorestoration

This project, performed as a joint venture with Ajax Building Corporation, involved a renovation of the Orthopaedics and Sports Medicine Institute at the University of Florida. The fourth floor was slated to house the new International Parkinson’s Disease and Movement Disorders Center, a cutting edge facility would bring together a multi-disciplinary […]

Read more

Tall Paul’s Brew House

The building that houses Tall Paul’s Brewery in Downtown Gainesville was built in 1901 and crumbling when our firm became involved in its renovation. The exterior brick walls were stabilized, a fire sprinkler system and exposed duct HVAC system were installed, and the original exposed truss wood ceiling was repaired […]

Read more

Senior Centers for the Suwannee River Economic Council

This project involved the construction of three identical senior centers in Trenton, Cross City, and Lake Butler, FL. Each building was a 4000 square foot pre-engineered metal building and included a fully finished interior including office, lobby, conference room, bathroom, and kitchen spaces. Exterior improvements included sidewalks and landscaping.

Read more

Physician’s Imaging

This project involved the renovation of a 5000 square foot portion of a medical office space to accommodate an MRI Imaging Facility. All existing interior walls, finishes, and systems were demolished. The MEP systems were rerouted and rebuilt for additional capacity in order to handle the loads of the new […]

Read more

Alachua County Visitor’s Center Renovations

This project involved improvements to the Alachua County Visitor’s Center in Gainesville, Florida. Renovations consisted of the conversion of the front lobby into an enclosed office, new eco-friendly bamboo flooring throughout, new interior finishes and trim, electrical and fire alarm upgrades and various exterior improvements.

Read more